Before-and-After Traffic Calming Evaluation Plan Template
For Road-safety practitioners and Traffic consultants and Council officers
Download editable Word documentUse this template to plan how a traffic-calming change will be evaluated before it is delivered. Record the location, intended safety or operating question, baseline, after period, measures, comparison context and known limits. A before-and-after comparison can describe what changed at a site; it does not by itself prove that the treatment caused every observed change. Choose a method proportionate to the decision and seek suitable expertise where needed.
Download the editable Word template to brief the work, record the matching before-and-after conditions, and capture the final recommendation.
When to use this template
Use it when a traffic-calming project, local-area scheme or related change is being planned or delivered and the team needs to know what will be reviewed afterward. Do not use it as a treatment design, benefit-cost analysis, statutory evaluation or claim of crash reduction.
Copyable evaluation plan
| Plan field | Record |
|---|---|
| Location and change | [Exact limits, map/location record, what changed and implementation dates] |
| Evaluation question | [What safety, movement, access or behaviour question will be examined?] |
| Before condition | [Data/observation source, period, site condition and limitations] |
| After condition | [Proposed period, adjustment time and conditions to record] |
| Measures | [Only measures linked to the question] |
| Comparison context | [Weather, school/events, network works, traffic diversion, other site changes] |
| Method/review | [Who interprets the evidence and how limitations will be reported] |
| Decision use | [What later decision the evaluation can inform] |
Austroads evaluation guidance explains that different before-and-after methods have different data needs and validity risks; road-safety management and treatment resources support a planned, context-aware approach. Introductory Guide for Evaluating Effectiveness, Guide to Road Safety Part 7, Main Roads WA Treatment Resource Guide
Fictional worked example
| Plan field | Example entry |
|---|---|
| Location/change | Fictional Grevillea Street, two-block local-street scheme; works completion date to be confirmed. |
| Question | How did the reported afternoon through-movement and crossing conditions change at the same locations? |
| Before record | Existing weekday observation and movement count, with dates and limitations retained. |
| After plan | Repeat comparable observation after an agreed settling period; record school calendar and nearby works. |
| Interpretation | Report observed changes and limitations; do not attribute a broader crash outcome from this short comparison. |
Limits and approvals
This template does not choose an evaluation method, comparison site, duration or success threshold. Changes in traffic, seasons, reporting and surrounding projects can affect interpretation. Retain the plan, raw sources, conditions and result against the exact location; where your organisation uses XVision Command, follow its configured record and governance practices.
Sources and further guidance
- Austroads, An Introductory Guide for Evaluating Effectiveness of Road Safety Treatments.
- Austroads, Guide to Road Safety Part 7.
- Main Roads Western Australia, Treatment Resource Guide.